The latest road traffic information of Chengdu has come to Jintang, and all bridges involved in flood situation have been controlled

, ,

,

Chengdu full search news network (reporter rez) reported on August 17, the reporter learned from Chengdu traffic management bureau that at present, due to the continuous rainfall in many sections of the city and traffic control of some expressways, it is suggested that the general public take bus and subway to travel. So far, the traffic congestion index is 1.25. The specific control information of

and

is as follows:

,

1. In the main urban area,

and

(1) there are 13 underpass tunnels and sections under traffic control due to waterlogging:

and

1. Water tunnels (2): Jinxin Road Underpass and Peifeng underpass.

and

2. Shuishui Road (11): Tianlong intersection of Beixing Avenue, South third intersection of Beixing avenue to Datian intersection, elevated part of Chengzi Luzhou expressway, No.2 Waterworks of Jingzhu South Street, Qinglong road of Dongyu Road, gate of leijian base of Sichuan Shaanxi auxiliary road of the third ring Road, Zhonghe Chaoyang Hengjie street, Zhonghe Xinyu Road, Zhonghe Huilong Avenue and Zhonghe Xinchuan road.

,

(2) there are 10 expressways under control due to rainfall:

,

ring expressway: Yongning toll station and Chenglong toll station are closed due to water;

and

main stations: Chengdu main station of Chengdu Mianyang expressway is closed;

,

, and

are closed

other toll stations: Chengwen qiongwenjiang north; Chengya Shuangliu South and Shuangliu north; Chengzi lupeijia (exit direction), Dalin, Xinglong entrance; Chengpeng Longqiao (entrance to the city) is closed.

and

II. Water accumulated on some roads in Tianfu New District, Shuangliu, Xindu, Wenjiang, Longquan, Pidu, Dujiangyan, Pengzhou, Qingbaijiang, Eastern New District and Pujiang urban area.

and

are waterlogged in the old urban area of Jintang and some roads in the new urban area. Bridges related to flood conditions have been controlled.

and

landslides in tianeling section of Longdu North Road in Longquan have been controlled; the landslide section from Hongsha to Yangcheng hotel has been under traffic control; the landslide on Wuluo road is under traffic control from Jintang to Longquan.

and

landslides occurred at the intersection between haidiya community of Chunjiang road and Chunjiang South Road. At present, the landslide section has been controlled.

,

Pengzhou Jianjiang road small-scale collapse road interruption, at present the landslide section has been controlled.

and

have been broken down at Wuli, Chengshan, Dujiangyan. At present, the landslide section has been controlled.

and

collapse of tuobai Village Road in Hongyuan Town, Jianyang City. At present, the landslide section has been controlled.

Pujiang S401 landslide from k486 + 120 to k486 + 820 in Pujiang section has been controlled.