The latest road condition of the expressway around Chengdu is coming!

, ,

and

reporters learned from the Sichuan Expressway traffic police that as of about 08:00, the weather of Expressway around Chengdu: moderate rain to light rain, and heavy rain in some sections. Traffic condition of

and

: due to heavy rain in some sections of Chengdu Mianyang Expressway and disposal of Qingbaijiang bridge danger, toll stations (including Chengdu Station) along the whole line are closed, and the first circle and the second circle are closed to enter the entrance of Chengdu Mianyang expressway.

and

(Chengdu Zigong Luzhou Expressway) closed all toll stations (except Chengdu Station) due to heavy rain.

,

(Duwen Expressway) single ridge tunnel, Wenchuan back to Chengdu direction of a road.

,

, ,

and

(Chengdu Mianyang Double Line Expressway) are in danger due to the shiting River Bridge (46 km in Shifang area), and the two ends of the main line are shunted at Xinshi (Miancheng) and Shifang North (Chengdu Mianyang) toll stations respectively, and the main line vehicles are diverted to bypass the main line, and the toll stations of the whole line are closed.

and

(west section of Er Rao highway) are closed due to heavy rain.

and

(east section of errao) are closed due to heavy rain. Toll stations

and

(Sanrao Expressway) are closed due to landslide at 174km, and the main line (pujianxiang) is at Heilongtan diversion station.

and

Yang Su

reporter of Jin · Guan of Chengdu Daily